|
Main Trilite Truss Sections were
all hung from the gallery roof, loaded with ETC Source 4's and Strand
SL's and focused to reflect off the water onto the gallery walls.
Dimming from Zero88 and control from a Jands Event brought the water to
life through its timed cycle.
Focusing the 12 lights was time
consuming, but Elizabeth's dedication to perfection brought admiration
from both crew and the public.
|